<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Ferronews.com &#187; Tjate</title>
	<atom:link href="http://www.ferronews.com/tag/tjate/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.ferronews.com</link>
	<description>Metal Industry News</description>
	<lastBuildDate>Mon, 12 Jul 2010 20:23:50 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.1</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Jubilee updates on Tjate</title>
		<link>http://www.ferronews.com/2009/02/18/jubilee-updates-on-tjate/</link>
		<comments>http://www.ferronews.com/2009/02/18/jubilee-updates-on-tjate/#comments</comments>
		<pubDate>Wed, 18 Feb 2009 17:54:50 +0000</pubDate>
		<dc:creator>Marc</dc:creator>
				<category><![CDATA[Featured]]></category>
		<category><![CDATA[Platinum]]></category>
		<category><![CDATA[Colin Bird]]></category>
		<category><![CDATA[Jubilee]]></category>
		<category><![CDATA[PGM]]></category>
		<category><![CDATA[Tjate]]></category>

		<guid isPermaLink="false">http://www.ferronews.com/?p=83</guid>
		<description><![CDATA[Jubilee Platinum, the AIM quoted and JSE Limited listed mining exploration and development Company with
a focus on platinum group metals (PGM) in South Africa, is pleased to announce the completion of its 42-
borehole drilling programme including new preliminary and final results from thirteen boreholes drilled on
Jubilee’s Tjate platinum project in the eastern Bushveld Complex in [...]]]></description>
			<content:encoded><![CDATA[<p>Jubilee Platinum, the AIM quoted and JSE Limited listed mining exploration and development Company with<br />
a focus on platinum group metals (PGM) in South Africa, is pleased to announce the completion of its 42-<br />
borehole drilling programme including new preliminary and final results from thirteen boreholes drilled on<br />
Jubilee’s Tjate platinum project in the eastern Bushveld Complex in South Africa.</p>
<p>This drilling programme forms part of Phase two of the feasibility study that commenced in early 2008.</p>
<p><strong>Highlights</strong><br />
• The drilling programme for Phase two of the feasibility study has now been completed;</p>
<p>• All 13 boreholes intersected the Merensky Reef (MR), (of which 2 intersected pothole facies), at<br />
expected projected depths (from plain elevation), with grades and thicknesses generally in line with<br />
the variability expected for this reef;</p>
<p>• Borehole DT35 intersected high assays in the motherhole MR (10.43 g/t 3PGE + Au) (combined<br />
platinum, palladium, rhodium and gold), 0.35% nickel (Ni) and 0.21% copper (Cu) over 0.99</p>
<p>metres – further results awaited from additional deflection drilling;</p>
<p>• Borehole DT40 intersected MR averaging 3.04 metres thick and assaying 6.71 g/t 3PGE+Au with<br />
0.16% Ni and 0.10% Cu – further deflection results awaited;</p>
<p>• Boreholes DT30 and DT33, intersected specifically targeted UG2 chromitite (UG2) reef at projected<br />
depths with higher than expected grades of up to 7.8g/t 3PGE+Au; and</p>
<p>• Borehole FF01, which tested continuity of MR in the adjacent down dip farm Fernkloof, intersected<br />
MR at approximate target depth (1,597m down hole from collar).</p>
<p>Colin Bird, CEO of Jubilee and Tjate Project Manager said: “These new results continue to confirm the<br />
continuity at depth of the Merensky and UG2 reefs. The lower grades seen in some of the new borehole<br />
results correlate generally with a regional pothole within a lower grade area confined to the northwest of the farm Dsjate. The effect of this area will be considered in the options when delineating the resource and<br />
defining a resource estimate. The drilling programme for the second phase of the feasibility study was<br />
completed this month and the project is now rapidly advancing towards a definitive compliant mineral<br />
resource estimate.”</p>
]]></content:encoded>
			<wfw:commentRss>http://www.ferronews.com/2009/02/18/jubilee-updates-on-tjate/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

